Time has not allowed a lot of work on the shop lately but some progress has been made. Most of the wiring has been completed thanks to the after work assistance of a good friend. Outlets are abundant and on every other stud. Lights and ceiling fan are hung and operational. HVAC unit will hopefully get in this weekend and I'll begin insulating walls. The metal roof was sprayed with foam insulation - what a NASTY job that was! Sprayed a coat of white paint over the foam to brighten the ceiling but still unsure about further insulation, time will determine if it is necessary. More pics after the weekend.