got a little over a week in this one. it's a sewing cabinet made for 2 machines with automatic lifts. this one has been challenging. got the news yesterday that it has to be stained!:crossedlips: did I ever mention I HATE stain? well it's stained and some time after turkey dinner I will start to get the clear on it. then I can install the lifts drawer slides and hang the doors. the doors will be paired with piano hinges into 2 sets. they wil open and fold together and swing around to the side out of the way. did I say challenging? not too much but the thought process has been well.......:gar-Bi man I miss those brain cells!:rotflm: it is red oak [mostly q-sawn] here are the obligatory pics.