I've got a small (4X16) expansion planned to the back of my shed for wood storage. It will be a lean-to against the back of the shed, closed in with T-111 siding.
I will be getting wet, freshly sawn 2X framing lumber from Randy (Woodbutcher). Should I immediately get this lumber framed or would I be OK stacking(not stickering), ratchet strapping and covering it for ~1 week? This will be next week so the weather will be cool. I don't want to end up with a stack of 2X pretzels. I can get those at Home Depot:help:
Thanks!
Mark
I will be getting wet, freshly sawn 2X framing lumber from Randy (Woodbutcher). Should I immediately get this lumber framed or would I be OK stacking(not stickering), ratchet strapping and covering it for ~1 week? This will be next week so the weather will be cool. I don't want to end up with a stack of 2X pretzels. I can get those at Home Depot:help:
Thanks!
Mark