well this has been a long ongoing project but I'm finally getting the walls up. electrical is done, ceiling is done heat/AC installed now putting up the wall siding. It's a T&G Juniper. Ceiling is T&G pine painted white. I'll pull a couple hundred BF out of our 30,000bf inventory for display. I'll build a nice display for the NCWOODWORKER flyers and cards somewhere, not sure where yet and still have to figure out displays, weld up vertical lumber raciks and sales counter. I'm still working out the details for the floors and have 6 faux/false beams to build for the ceiling which will have the hand hewn type look to them like our sign post.