Starting 1.5 years ago my build began, clearing and road building on steep ground has its challenges. Hitting bed rock in the footers and basement floor caused modifications with elevations. Concrete and laying block is not my forte so contracted this out. 9 steps in the footer increased the cubic yards of concrete that had to be pumped. The mason has to carry the block around the site in wheel barrow or by hand. Thru all this the contractors have been wonderful. Yeah it slows progress but the build is looking great.
The shop is 52 x 28 with a 18 x 52 basement and the crawl space is 5 ft high. The dust collection system will be below floor. I will update progress along the way. Ray