We are going to remove the carpet from our family room and replace it with hardwood flooring; either standard 3/4" or some of the newer engineered wood. I talked with one flooring company and they said that either way, the particle board over the sub floor will have to be removed because they cannot nail the new floor into the particle board.
Sounds right to me, but another contractor didn't seem to think it was necessary. Anyone have experience with this?
Sounds right to me, but another contractor didn't seem to think it was necessary. Anyone have experience with this?