The first step to install the kiosks was to dig the holes (2-man auger), drop the 6x6 posts into the two holes and clamp the two horizontal half-lapped beams in place to form the Bulletin Board openings -- the diagonal bracing insured these opening were square and braces to ground maintained everything plumb before the concrete was poured.