Laid my bath floor over liquid membrane. Totally moisture proof. 12 x 12 tiles in thinset. OK, set in the usual time, but how long does it take for the moisture to wick out to the edges and evaporate? I don't want to seal it in with Spectra Loc or epoxy grout.
Never thought about it before as I only laid over hardi-board.
Never thought about it before as I only laid over hardi-board.