Soul of a New Machine

JNCarr

Joe
Corporate Member
If you're like me, seeing the guts of a project is often almost as rewarding as seeing the finished product - I learn a lot from what and how others are doing things.
So in that spirit, here are a few pictures of a new clock under construction. All parts are now cut out (waiting for laser cut aluminum hands) and finishing and assembly will begin after Christmas.
 

Attachments

  • All parts except hands.jpg
    All parts except hands.jpg
    3.8 MB · Views: 149
  • Front face and motor mounts on CNC.jpg
    Front face and motor mounts on CNC.jpg
    2.2 MB · Views: 137
  • Orbit Gear and hubs.jpg
    Orbit Gear and hubs.jpg
    2.1 MB · Views: 139
  • Steam Bending.jpg
    Steam Bending.jpg
    2.8 MB · Views: 128
  • Steam bent trim on form.jpg
    Steam bent trim on form.jpg
    2.6 MB · Views: 139
  • Vacuum Veneering the Back.jpg
    Vacuum Veneering the Back.jpg
    1.7 MB · Views: 136

smallboat

smallboat
Corporate Member
Joe- my long lost brother! Not only do your kitchen cabinets and tile work closely resemble mine, you do woodworking on the stove. Thought I was the only one. Can’t wait to see the completed work. Those look like stepper motors. What do you control them with?
 

JNCarr

Joe
Corporate Member
Joe- my long lost brother! Not only do your kitchen cabinets and tile work closely resemble mine, you do woodworking on the stove. Thought I was the only one. Can’t wait to see the completed work. Those look like stepper motors. What do you control them with?
I normally do the steaming using the gas grill outside, but it was just too cold.
Yes, those are steppers - they're controlled by an Arduino microcontroller mounted onto a custom circuit board.
 

Attachments

  • Arduino Controller.jpg
    Arduino Controller.jpg
    490.3 KB · Views: 71

JNCarr

Joe
Corporate Member
As with pretty much everything on this particular clock, the gears are cut with CNC.
Happy Holidays
 

Bas

Recovering tool addict
Bas
Corporate Member
Cool to see so many different skills come together, thanks for sharing!
 

JNCarr

Joe
Corporate Member
A few more pics of the assembly and a final of it on the test stand where I uploaded the software for the controller.
Shipping box is ready and I'll run it for another week or so then off to its new owner in Iowa.
 

Attachments

  • Finished Clock on test stand.jpg
    Finished Clock on test stand.jpg
    3.1 MB · Views: 76
  • Magnetic Sensors and Hour Motor.jpg
    Magnetic Sensors and Hour Motor.jpg
    4.2 MB · Views: 74
  • Mid-Frame.jpg
    Mid-Frame.jpg
    3.9 MB · Views: 69
  • Orbit and Sun Gears.jpg
    Orbit and Sun Gears.jpg
    4.4 MB · Views: 74
  • Steambent Maple Trim glueup.jpg
    Steambent Maple Trim glueup.jpg
    3.7 MB · Views: 76

Premier Sponsor

Our Sponsors

LATEST FOR SALE LISTINGS

Top