One of the big builders here, remodeling his own house just purchased.
Sends me a drawing for a cabinet, I price it and send a quote, he sends a check for deposit. I don’t the cash the check, as I don’t have enough information to do the job right.
Go to his house to measure and find out he wants to build a pantry cabinet which will cover his entire electrical panel. Wants a section open on the cabinet back so the panel can be be accessed.
Not allowed, NEC chapter 10.26 against code. Suggested we abort and handed him his check back.
Shouldn’t a GC know this?
Sends me a drawing for a cabinet, I price it and send a quote, he sends a check for deposit. I don’t the cash the check, as I don’t have enough information to do the job right.
Go to his house to measure and find out he wants to build a pantry cabinet which will cover his entire electrical panel. Wants a section open on the cabinet back so the panel can be be accessed.
Not allowed, NEC chapter 10.26 against code. Suggested we abort and handed him his check back.
Shouldn’t a GC know this?