It took me a couple of months and several more months of planning.
It took a lot of trial and error, supplies from 4 different places, several trips to Klingspor, and 1 trip back to Klingspor returning the things I didn’t use.
Total of 11 tools and 2 floor sweeps.
I’m pretty happy with the outcome. Not perfect, but still pretty good.
It took a lot of trial and error, supplies from 4 different places, several trips to Klingspor, and 1 trip back to Klingspor returning the things I didn’t use.
Total of 11 tools and 2 floor sweeps.
I’m pretty happy with the outcome. Not perfect, but still pretty good.
Attachments
-
FB0352EB-2BFD-4728-AC6C-75B6893F7609.jpeg2.7 MB · Views: 373
-
33A3A891-2F0B-4C0A-92D2-E9312DA314F5.jpeg2.3 MB · Views: 388
-
9B19C035-C1B7-4A54-A618-A8B70999A804.jpeg2.1 MB · Views: 398
-
EA7D5975-5844-4FC7-B897-E0BF1B9DBF53.jpeg2.4 MB · Views: 407
-
6E8F77D1-E178-48E6-B26A-7D5CC9D95CC1.jpeg2.6 MB · Views: 379