Electrical inspector came out twice this week. On Tuesday he failed the rough-in because the conduit from the main to the shop sub panel was only 16" deep when it was supposed to be 18". Hmmm?? He measured from the top of pipe, my guy measured from the bottom of the trench. On Thursday, two days later and four inched deeper, it PASSED.