I just cut the top trim pieces and routed the profile. Once I get the pecan gel stain (sample in right drawer opening) on the drawer fronts, slider shelf and top trim, I will be ready for final glue up, sanding and top-coat finishing!
A parting look at the main posts with half-lapped horizontal 4x4's for the door opening and roof framing. The diagonals were half-lapped onto the roof frame (see KC - 20) and lag screwed into the main posts.
Well, after a few days acting as an industrial electrician I have all three of my machines up and running. The edge sander is powered and plumbed for DC. The W&H molder is powered with a hookup for DC when in use. The big one was the 3 spindle shaper.
Most of you know about this tool...