I dropped two 4x4 posts in the gound, 18" under in cement & 4'-6" above, about 9 ft apart, screwed a 2x6 to both sides, stretched between them, with 3" of ground clearance(for easy weed eating). Seems to be pretty stable so far.
I'm not the best at times explaining things, but I tried.