It has taken a long time to get this project off the ground but here is goes. Had all the plans drawn up and approved by Chatham County by Jan 1. Had to wait out the monsoon season, and finally got the foundation done in mid April. This is where I am at as of today. Starting the electrical, doors and windows are on the way and the siding and trim shortly after. Putting wood on the walls. Looking at spray foam insulation and possibly a mini split unit. Open crawl so I am running dust control to vent outside, and some electrical under the floor. Am I forgetting something.