Made two cabinets including 4 drawers over last night and tonight. I was just wrapping up for the night and decided to do some dry assembly before heading out of the shop. Had one cabinet about assembled and realized I never cut the top stretchers . . . . .
I'm already dusty and thinking I'll just knock these out quick. Sure enough, two cuts into my ripping the stretchers, I realize I am cutting the piece I had made for the back of the cabinet instead of the scrap pieces I had on the other side of the table saw.
You have to be kidding me . . . . What a rookie mistake that was and yes, it does mean a trip for another sheet of ply. Ugh! (But my locking dado's on the drawers were absolutely perfect! )
I'm already dusty and thinking I'll just knock these out quick. Sure enough, two cuts into my ripping the stretchers, I realize I am cutting the piece I had made for the back of the cabinet instead of the scrap pieces I had on the other side of the table saw.
You have to be kidding me . . . . What a rookie mistake that was and yes, it does mean a trip for another sheet of ply. Ugh! (But my locking dado's on the drawers were absolutely perfect! )