They recommend you purchase plastic shims -- one bag for every 60 panels (240 sq ft). I ended up returning all of the shims I purchased. The floor was mostly level and I didn't see the need. The tiles themselves don't interlock perfectly even in all cases. If your concrete is significantly uneven then I could see needing these.
I first saw this floor on Bob Gabor's shop. I liked the look and decided to use it on mine. I don't have any equipment on it yet. Hoping it lives up to the specs. These say they panels support 3153 lbs/sq ft. I don't have anything remotely close to that weight, but some tools concentrate a lot of weight in a few square inches.
You can feel the difference walking or standing on it. There is some give that you don't get with concrete. I have rubber mats strategically placed on the concrete in my current shop. I'm looking forward to getting rid of these. They make sweeping a pain.