Finally after weeks of waiting we got the blocks laid and started the framing. I hope the rest of the project doesn't take as long as the foundation or I'll be too old to use it.
 

Attachments

  • 100_0225.jpg
    100_0225.jpg
    167.7 KB · Views: 212

MikeH

New User
Mike
Finally after weeks of waiting we got the blocks laid and started the framing. I hope the rest of the project doesn't take as long as the foundation or I'll be too old to use it.

That is coming along nicely! Keep us updated with pics.
 

Alan in Little Washington

Alan Schaffter
Corporate Member
That will be a great addition! What will the roofline look like- how will you transition to the existing building? Will you have access from the existing second floor to the attic area over addition?
 

Larry Rose

New User
Larry Rose
Alan, the new roof will have the same pitch as the upper part of the existing roof and tie to the lower part of the existing roof about halfway up. No, there will not be enough head room to open the space over the ceiling to the existing second floor. I think code requires that I provide access however.
 

sapwood

New User
Roger
Hmmm, got me drooling with envy :mrgreen:

Wish you smooth sailing with the rest of the work,
Roger
 