Way to go, Mike. You are blessed with the sense of "Perfect Timing".
All the heavy, tough work is done. The shell is there, now the fun part comes in. Gonna do the floor with 3/4" treated plywood, stud out the walls and door frame and do the roof.
I do, however, appreciate your offer. :rolf::rolf: