Search results

  1. E

    Clamps needed to borrow/rent

    I’m doing my first glue-up of a large panel, i.e. 42” wide tabletop, and need to borrow or rent at least 6 pipe clamps, bar clamps, or parallel clamps for a couple of weeks. Yes, I know the glue up won’t take but a day, but I’m not sure when I’ll get to this. If I planned on doing other large...
  2. E

    Jointing / Planing needed

    I’m a novice woodworker with a small shop in a one-car garage. I am making a farmhouse table and bought the slabs (rough sawn) for the table top from a local lumber yard thinking I’d just butt them together and hit them with a belt sander to smooth them somewhat. Now the wife says she wants a...

Premier Sponsor

Our Sponsors

LATEST FOR SALE LISTINGS

Top